publicationethics.org

PROJECT RESOURCE PLANNING WITH AVAILABLE RESOURCES

10.15660/AUOFMTE.2016-2.3226

Zvodnimir BOŽILOVIĆ, Nenad NIKOLIĆ

office@graditelj-inzenjering.co.rs

Volume XXV (XV), 2016/2

A complex project, as well as in the construction industry requires the engagement of more than one category Work resources use more types of resource-type material and the disposal of the corresponding budget Work resources are usually considered the available amount of time. Resources type of material is characterized by purchases,spending, and inventories. By analogy, is considered the budget:security or inflow of money, payment of costs and liquidity. This paper points to the same time planning the following types of resources and brings together two well-known problems: planning of materials and planning of liquidity.

Keywords: construction project, liquidity, optimization, mathematical models.