Waste reduction by implementation of CNC machining center and Lean Manufacturing
10.15660/AUOFMTE.2020-1.3516
I C Gherghea, D C Negrau, C Bungau, M Faur
cosmin.gherghea@csud.oradea.ro
Volume XXIX, 2020/1
The objective of this study is to implement Lean manufacturing tools, in order to improve the production process carried out within a manufacturing company, with a small manufacturing batch. Based on real data from the manufacturing process, the current value stream mapping (VSM) was built, identifying both operational and non-operational times.
ISSN 1583-0691, CNCSIS "Clasa B+"

